Aprilia Tuono V4 2025-2026 GP-R3 slip-on exhaust

Availability 1-15 Working days

£349.00
Shipping calculated at checkout.

Select Material:
Select Sleeve:
Description
The GP-R3 slip-on exhaust for Aprilia Tuono V4 2025-2026 delivers premium performance engineered specifically for this naked bike platform. Manufactured in the UK, it combines refined engineering with a character that transforms your riding experience.

Available in stainless steel or titanium with brushed carbon fibre or ceramic black finishes, the GP-R3 complements the Tuono V4's aggressive aesthetics while reducing weight and sharpening throttle response. The removable baffle gives you control over sound output—from track-focused intensity to street-friendly refinement.

Precision-engineered for the 2025–2026 Tuono V4, the GP-R3 delivers measurable gains in performance and dynamics. Built for riders who demand quality, distinctive sound, and real improvements in how their bike behaves.
Technical Features

Full Titanium or stainless steel construction.
Full Pie cut design.
Advanced flow dynamics.
Massive weight savings.
Simply bolt on and ride!
Gives a 3-5 bhp power gain.
Removable baffle supplied with exhaust.
Full fitting instruction supplied.
Retains pillions pegs if required.
No remap required.

DB Levels

DB levels tested @ 5250RPM

GP-R3 = 99 DB's with baffle fitted

Weights

Stock = 4.3 KG

Titanium GP-R3 = 0.850kg
Titanium GP-R3 carbon = 0.810kg

Kit Content

1 x GP-R3 exhaust.
1 x Removable baffle.
1 x Bolt kit (All fixings required)
1 x Full fitting instructions.
1 x Pro-Race official lifetime warranty

Lead Times

Due to the extremely high demand for our products we currently have lead times, We show the realistic lead times for each product on there listing page below the title.

Please note: Your order may be, and in many cases are shipped faster than the lead time stated on the listing but we want you to be aware that every product is hand-made to order solely in our UK factory by us.

Ceramic coating: Please note that adding ceramic coating to your product will add 1 additional week to the dispatch date due to the coating process.

If you have any Questions regarding our lead times please contact us..