BMW R12 2024-2026 GP-R1L slip-on exhaust

Availability 1-15 Working days

£324.00
Shipping calculated at checkout.

Select Material:
Select Sleeve:
Description
The GP-R1L slip-on exhaust transforms your BMW R12 2024–2026 with precision-engineered performance and distinctive character. UK-manufactured from premium stainless steel or titanium, it's available in brushed, carbon fibre, or ceramic black finishes to complement your bike's aesthetic.

The lightweight design improves throttle response and handling while delivering a refined, aggressive exhaust note. A removable baffle lets you dial in the sound for city riding or spirited road use—adjustable performance tailored to your conditions.

Built for durability and meticulous detail, the GP-R1L integrates seamlessly with your R12's engineering. It's the upgrade for riders who demand quality, visual impact, and tangible performance gains in one complete package.
Technical Features

Full Titanium or stainless steel construction.
Full Pie cut design.
Advanced flow dynamics.
Massive weight savings.
Simply bolt on and ride!
Gives a 3-5 bhp power gain.
Removable baffle supplied with exhaust.
Full fitting instruction supplied.
Retains pillions pegs if required.
No remap required.

DB Levels

DB levels tested @ 5250RPM

GP-R1L = 99 DB's with baffle fitted

Weights

Stock = 4.3 KG

Titanium GP-R1L = 0.850kg
Titanium GP-R1L carbon = 0.810kg

Kit Content

1 x GP-R1L exhaust.
1 x Removable baffle.
1 x Bolt kit (All fixings required)
1 x Full fitting instructions.
1 x Pro-Race official lifetime warranty

Lead Times

Due to the extremely high demand for our products we currently have lead times, We show the realistic lead times for each product on there listing page below the title.

Please note: Your order may be, and in many cases are shipped faster than the lead time stated on the listing but we want you to be aware that every product is hand-made to order solely in our UK factory by us.

Ceramic coating: Please note that adding ceramic coating to your product will add 1 additional week to the dispatch date due to the coating process.

If you have any Questions regarding our lead times please contact us..