BMW R1200 & R1250 GS 2014-2021 EVO-RC Titanium slip-on exhaust

Availability 1-15 Working days

£549.00
Shipping calculated at checkout.

Select Sleeve:
Description
Engineered for the R1200 & R1250 GS's adventure-touring demands. Our EVO-RC slip-on combines CNC billet aluminium endcaps—pocketed for weight reduction—with premium titanium tubing optimised for this platform. The sculpted endcap design delivers aggressive presence whilst maintaining the integrated styling language of the GS.

Removable baffle system lets you dial in sound character to suit your riding conditions. Lightweight titanium construction enhances the R1200 & R1250 GS's agility and handling on technical terrain and long-distance runs whilst delivering measurable power gains across the entire rev range. Tested in championship environments, proven across diverse real-world applications.

Built for riders who demand both engineering substance and visual refinement.
Technical Features

Full Titanium or stainless steel construction.
Full Pie cut design.
Advanced flow dynamics.
Massive weight savings.
Simply bolt on and ride!
Gives a 3-5 bhp power gain.
Removable baffle supplied with exhaust.
Full fitting instruction supplied.
Retains pillions pegs if required.
No remap required.

DB Levels

DB levels tested @ 5250RPM

EVO-RC = 99 DB's without baffle fitted

Weights

Stock = 4.3 KG

Titanium EVO-RC = 1.350kg (300mm Sleeve)

Kit Content

1 x EVO-RC exhaust.
1 x Removable baffle.
1 x Bolt kit (All fixings required)
1 x Full fitting instructions.
1 x Pro-Race official lifetime warranty

Lead Times

Due to the extremely high demand for our products we currently have lead times, We show the realistic lead times for each product on there listing page below the title.

Please note: Your order may be, and in many cases are shipped faster than the lead time stated on the listing but we want you to be aware that every product is hand-made to order solely in our UK factory by us.

Ceramic coating: Please note that adding ceramic coating to your product will add 1 additional week to the dispatch date due to the coating process.

If you have any Questions regarding our lead times please contact us..