Kawasaki ZX-10R 2004-2005 EVO-RC Titanium slip-on exhaust

Availability 1-15 Working days

£549.00
Shipping calculated at checkout.

Select Sleeve:
Description
EVO-RC Titanium Slip-On for Kawasaki ZX-10R (2004–2005)

Engineered for the early-generation ZX-10R's raw supersport performance. Our EVO-RC slip-on features CNC billet aluminium endcaps—pocketed for weight reduction—paired with premium titanium tubing precisely tailored to this model's geometry and airbox clearance. The sculpted endcap design delivers aggressive visual character without compromise to fitment.

Removable baffle system lets you dial in sound to match your riding intensity. Lightweight titanium construction maintains the ZX-10R's agile chassis dynamics whilst unlocking measurable power gains across the entire rev range. Tested on track, proven on road.

Built for riders who demand engineering substance and visual impact.
Technical Features

Full Titanium or stainless steel construction.
Full Pie cut design.
Advanced flow dynamics.
Massive weight savings.
Simply bolt on and ride!
Gives a 3-5 bhp power gain.
Removable baffle supplied with exhaust.
Full fitting instruction supplied.
Retains pillions pegs if required.
No remap required.

DB Levels

DB levels tested @ 5250RPM

EVO-RC = 101 DB's with baffle fitted

Weights

Stock = 4.3 KG

Titanium EVO-RC = 1.350kg (300mm Sleeve)

Kit Content

1 x EVO-RC exhaust.
1 x Removable baffle.
1 x Bolt kit (All fixings required)
1 x Full fitting instructions.
1 x Pro-Race official lifetime warranty

Lead Times

Due to the extremely high demand for our products we currently have lead times, We show the realistic lead times for each product on there listing page below the title.

Please note: Your order may be, and in many cases are shipped faster than the lead time stated on the listing but we want you to be aware that every product is hand-made to order solely in our UK factory by us.

Ceramic coating: Please note that adding ceramic coating to your product will add 1 additional week to the dispatch date due to the coating process.

If you have any Questions regarding our lead times please contact us..